CALIBRATION AND Confirmation 18 Centrifuge Tools 11 Cetane Quantity 23 Cool Stream AND Icing Stage 5 Colour 15 Conductivity and Insulation 21 Deterioration and Rust 4 Distillation 2 Display Point 1 Foaming, Air Launch and Emulsification 12 General Laboratory Products 20 Hardening and Softening 6 LPG 13 PARTICULATES, RESIDUES AND COMPOSITION 10 Penetration 7 REFERENCE MATERIAL AND STANDARDS 19 Break up and Evaporation 17 Container Sampling and Gauging 16 Temperature and Fluid Density 14 Tribology and Bearing Lubrication 9 Vapour Stress 22 Viscosity 3 Industries Industries.Plunger release and preservation is managed by a solid state timer which can be established for penetration periods of 5, 8, 10, 12, 30 and 60 mere seconds.
Penetration is usually shown on a accuracy digital measuring level with drive switch zeroing possible at any stage. The machined aluminium lightweight base will be installed with a flexible light with a dimmer change, and an inbuilt nature level. Provided with; 47.5 gary the gadget guy plunger 50 h and 100 g plunger weight loads Instruction guide. Standard check technique for move balance of lubricating oil. Standard check method for needle transmission of oil waxes. Standard check strategies for cone transmission of lubricating fat making use of one-quarter ánd one-half size cone gear. Determination of cone transmission of grease - One-quarter ánd one-half range cone technique. Shear Balance of Lubricating Oil in Existence of Water (Water Stability Test). Stage Plot 2.9.9 Serial Quantity AndIn 1974 140000L began along part on 187301T Are you certain you have got a body serial quantity and not really an motor serial amount A picture would assist ID. ![]() ![]() Other art logos on this page are the property or home of their respective owners.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |